AOWIN - Installation Progress of Complete Feed Processing Equipment

2026-05-26 10:59:24

AOWIN - Installation Progress of Complete Feed Processing Equipment


Fully Installed Equipment
Water Drop Powder Feed Production Line in Chifeng, Inner Mongolia
Equipment Under Installation
Powder Feed Processing Production Line in Zunyi, Guizhou

Chifeng, Inner Mongolia | Water Drop Powder Feed Production Line

Unit Introduction

A 3-5 tons per hour powder feed production line has been fully installed and commissioned for a cattle farm in Chifeng, Inner Mongolia.


The customer purchased two complete sets of this production line, which are specially designed for powder feed production. The whole line is equipped with a 5-ton raw material silo and water drop hammer mill at the front section, followed by powder buffer bins, feed batching scales and horizontal single-shaft double spiral mixers. The rear part consists of finished product buffer bins and automatic quantitative packing machines.


This line realizes automatic crushing, batching, mixing, storage and packaging. It is suitable for both self-use on farms and commercial feed sales.


The installation of the first set started on May 10, 2026 and was completed on the morning of May 18. The second set started construction in the afternoon of the same day. Both production lines completed installation and trial operation on May 26, 2026. The whole project was efficiently delivered within only 16 days.

f25d34e432e13660c1d348f6e944684f_副本_副本


Zunyi, Guizhou | Powder Feed Processing Production Line

Unit Introduction

A 10 tons per hour powder feed processing production line is currently under installation at a cattle farm in Zunyi, Guizhou.


This line takes dried distillers' grains as the main raw material to produce concentrated supplementary feed for cattle. The process includes drying and preliminary cleaning of wet distillers' grains, followed by crushing, packaging and palletizing.


The complete equipment list includes dryers, rotary raw material pre-cleaning sieves, 2 sets of water drop hammer mills, 2 sets of pulse dust collectors, 2 galvanized steel silos of 30 cubic meters, 2 pre-crushing bins of 2 cubic meters, packaging & palletizing units, lifting and conveying equipment, as well as the control system.


From May 20, 2026 to May 26, 2026, our professional technical team completed overall equipment assembly, air compressor installation, circuit wiring and equipment painting. Meanwhile, we finished the commissioning of belt conveyors and palletizers, as well as the no-load test run of the entire production line, ensuring steady progress of the project.

c029d4831b7ce7f2f7e3e47f54d3d710_副本

AOWIN is a professional manufacturer integrating production, R&D, sales, installation and after-sales service.